• Home
  • works
    • Architecture
    • urban design
    • On the Boards
  • about
    • firm
    • founder
    • re
    • awards
  • BLOG
  • CONTACT
re:architecture
  • Home
  • works
    • Architecture
    • urban design
    • On the Boards
  • about
    • firm
    • founder
    • re
    • awards
  • BLOG
  • CONTACT

A Few Studies

November 2016: re:architecture is working with Mile High Early Childhood Center in Denver on a new strategic vision of their new home.  

January 2017: re:architecture is working with the City of Boulder to study options for a new market hall to activate the Civic Area in downtown Boulder.

 

categories: Uncategorized
Thursday 10.27.16
Posted by repstein
Newer / Older